Document Library

The document library is where you can search for materials related to the planning of the Port Lands and the Port Lands Flood Protection project. This includes displays and presentations from public meetings. If you can’t find what you are looking for, email us.

Construction Notice #49 May 7, 2024

Find the latest information about what to expect from ongoing construction. Download the latest construction notice below.

Villiers Island Density Study Public Meeting Summary, June 2023

Read a summary of all the questions and answers from the most recent Public Information Centre.

Documents

  • Item 8b – Capital Approval for Port Lands Flood Protection and Enabling Infrastructure – Schematic Design and Environmental Approvals 09/03/2017 View
  • Item 9 – Cherry Street Stormwater and Lakefilling Contracting Strategy 09/03/2017 View
  • Design Review Panel Meeting Presentation – Tommy Thompson Park Park Entrance Development Project (Draft) 15/02/2017 View
  • Design Review Panel Meeting Minutes 15/02/2017 View
  • Design Review Panel Meeting Agenda 15/02/2017 View
  • Design Review Panel Meeting Presentation – Port Lands Due Diligence 25/01/2017 View
  • Design Review Panel Meeting Agenda 25/01/2017 View
  • Board Item 12 – Port Lands Funding 12/12/2016 View
  • Presentation – Port Lands Flood Protection and Enabling Infrastructure Project 08/12/2016 View
  • Item 8c – Port Lands Flood Protection and Enabling Infrastructure Project Update 30/11/2016 View
  • Board Meeting Presentation: Item 5 – Port Lands Due Diligence 25/10/2016 View
  • Board Item 5 – Port Lands Flood Protection – Due Diligence Report 25/10/2016 View
  • Board Item 5b – Port Lands Flood Protection Due Diligence Report – Motion and Executive Summary 25/10/2016 View
  • Board Item 6 – Essroc Quay Lakefilling 25/10/2016 View
  • Appendix 1: Lower Don River Due Diligence and Validation Report (MVVA) 20/10/2016 View
  • Appendix 10: Integrated Soil Management Plan (CH2M Report F) 20/10/2016 View
  • Appendix 11: Preliminary Groundwater Management Plan (CH2M Report G) 20/10/2016 View
  • Appendix 12: Earthworks Methodology (CH2M Report H) 20/10/2016 View
  • Appendix 13: Environmental Cost Estimate (C2M Report I) 20/10/2016 View
  • Appendix 14: Figures to Accompany CH2M Reports 20/10/2016 View