Document Library

The document library is where you can search for materials related to the planning of the Port Lands and the Port Lands Flood Protection project. This includes displays and presentations from public meetings. If you can’t find what you are looking for, email us.

Construction Notice #49 May 7, 2024

Find the latest information about what to expect from ongoing construction. Download the latest construction notice below.

Villiers Island Density Study Public Meeting Summary, June 2023

Read a summary of all the questions and answers from the most recent Public Information Centre.

Documents

  • Appendix 15: Marine Engineering Services to Develop Preliminary Designs for Land Creation Works Surrounding Essroc Quay (Riggs) 20/10/2016 View
  • Appendix 16: 2015 Dockwall Structural Assessment Lower Don Lands (Riggs) 20/10/2016 View
  • Appendix 17: Executive Summary: Recommendations and Rationale for Construction Cost Escalation Factors (Hanscomb) 20/10/2016 View
  • Appendix 18: Conceptual Cost Estimates (Hanscomb) 20/10/2016 View
  • Appendix 19: Appendix E: Detailed Project Schedule (HDR) 20/10/2016 View
  • Appendix 2: Due Diligence and Validation Documents (Plans) (MVVA) 20/10/2016 View
  • Appendix 20: Cost Risk Assessment (HDR) 20/10/2016 View
  • Appendix 21: Don River Delft3D Model Refinement (Baird) 20/10/2016 View
  • Appendix 22: DELFT Modelling Results (TRCA) 20/10/2016 View
  • Appendix 23: Port Lands Flood Protection and Enabling Infrastructure (EY) 20/10/2016 View
  • Appendix 24: Market Demand Projections Update (Cushman & Wakefield) 20/10/2016 View
  • Appendix 25: Port Lands Don Mouth Naturalization Project Due Diligence Revenue Projections Update (Cushman & Wakefield) 20/10/2016 View
  • Appendix 26: Economic Impacts of Port Lands Development (urbanMetrics) 20/10/2016 View
  • Appendix 27: Peer Review of urbanMetrics Report Dates July 10, 2014 (PwC) 20/10/2016 View
  • Appendix 28: Port Lands Development Related Capital Analysis (Hemson) 20/10/2016 View
  • Appendix 29: Feasibility Study: Transmision Line Relocation/Modification Cost Estimate (Hydro One Inc. (HONI)) 20/10/2016 View
  • Appendix 3: Port Lands Environmental, Geotechnical, and Hydrogeological Investigation (GHD) 20/10/2016 View
  • Appendix 30: Environmental Opinion Letter (Fasken) 20/10/2016 View
  • Appendix 31: Executive Level Review of the Due Diligence Final Report (Kiewit) 20/10/2016 View
  • Appendix 32: Peer Review of the Due Diligence Report (Rijkswaterstaat) 20/10/2016 View