Document Library

The document library is where you can search for materials related to the planning of the Port Lands and the Port Lands Flood Protection project. This includes displays and presentations from public meetings. If you can’t find what you are looking for, email us.

Construction Notice #52 October 25, 2024

Find the latest information about what to expect from ongoing construction. Download the latest construction notice below.

Villiers Island Density Study Public Meeting Summary, May 2024

Read a summary of all the questions and answers from the most recent Public Information Centre.

Documents

  • CLC #3 – September 24, 2018 09/09/2018 View
  • Port Lands Flood Protection SAC #3 – Presentation 21/08/2018 View
  • Updated Port Lands Flood Protection Due Diligence Appendices 01/08/2018 View
  • Design Review Panel: Port Lands Flood Protection and Enabling Infrastructure – Bridges, Design Schematic, July 25, 2018 25/07/2018 View
  • Construction Notice #5: July 16, 2018 19/07/2018 View
  • Waterfront Toronto Intro Presentation – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Design Team Presentation – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Display Panels (Before / After Views) – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Display Panels (Proposed Programming / Roads & Bridges) – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Display Panels (Proposed Programming / Building an Urban River Park) – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Display Panels (Port Lands 101) – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Display Panels Project (Timeline) – Port Lands Flood Protection Community Consultation 18/07/2018 View
  • Summary Report – Community Consultation #2 18/07/2018 View
  • Construction Notice #4: Port Lands Flood Protection, June 12, 2018 12/06/2018 View
  • CLC #2 – June 7, 2018 07/06/2018 View
  • Port Lands Flood Protection SAC #2 Handout 18/05/2018 View
  • Port Lands Flood Protection SAC #2 – Presentation 16/05/2018 View
  • Construction Notice #3: Cherry Street Stormwater & Lakefilling, April 27, 2018 27/04/2018 View
  • Design Review Panel Presentation: Port Lands Flood Protection and Enabling Infrastructure: Parks and River, Bridges, Roads and Municipal Infrastructure Schematic Design 18/04/2018 View
  • Design Review Panel Presentation: Port Lands Flood Protection River Valley and Parks Design 18/04/2018 View